
| Primer | Enamel Top Coating | Varnish(optional) | |
| Property | Solvent | Solvent | Solvent |
| Dry film thickness | 100μm-200μm/layer | 150μm-250μm/layer | 80μm-120μm/layer |
| Theoretical coverage | 0.15 kg/㎡ | 0.20 kg/㎡ | 0.10 kg/㎡ |
| Touch dry | <2h(25℃) | <8h(25℃) | <2h(25℃) |
| Drying time (hard) | 12hours | 12hours | 12hours |
| Volume solids % | 80 | 85 | 80 |
| Application restrictions Min. Temp. Max. RH% |
(-10) ~ (80) | (-10) ~ (80) | (-10) ~ (80) |
| Flash point | 28 | 38 | 32 |
| State in the container | After stirring, there is no caking, showing a uniform state | After stirring, there is no caking, showing a uniform state | After stirring, there is no caking, showing a uniform state |
| Constructability | No difficulty in spraying | No difficulty in spraying | No difficulty in spraying |
| Nozzle orifice (mm) | 1.5-2.0 | 1.5-2.0 | 1.5-2.0 |
| Nozzle pressure(Mpa) | 0.1-0.2 | 0.1-0.2 | 0.1-0.2 |
| Water resistance(96h) | Normal | Normal | Normal |
| Acid resistance (48h) | Normal | Normal | Normal |
| Alkali resistance(48h) | Normal | Normal | Normal |
| Yellowing resistance (168h) | ≤3.0 | ≤3.0 | ≤3.0 |
| Wash resistance | 2000 times | 2000 times | 2000 times |
| Tarnish resistance /% | ≤15 | ≤15 | ≤20 |
| Service life | >10 years | >10 years | >10 years |
| Storage time | 1 year | 1 year | 1 year |
| Paint colors | Multi-color | Multi-color | Transparent |
| Application way | Roller,Brush or Spray | Roller,Brush or Spray | Roller,Brush or Spray |
| Storage | 5-30℃, cool, dry | 5-30℃, cool, dry | 5-30℃, cool, dry |
Pre-treated substrate
Primer
Enamel Top Coating
Varnish (optional)
| Application Scope | |
| Suitable for indoor and outdoor metal surface protection, such as steel structure of pipeline, metal furniture,marine, construction industry, electrical industry, instrument industry etc. | |
| Package | |
| 20kg /barrel and 6kg /barrel. | |
| Storage | |
| This product stored at above 0 ℃, well ventilation, shady and cool place. |
Construction Conditions
The surface should be polished, repaired, dust collected according to the site basic surface condition; Correct substrate preparation is critical for optimum performance. Surface should be sound, clean, dry and free from loose particles, oil, grease, and other contaminants.
Application Step
Primer:
1) Mix ( A )Primer, ( B ) curinge agent and ( C ) thinner in a barrel according to ratio by weight;
2) Fully mix and stir in 4-5 min until without equal bubbles, ensure paint be fully stirred. The main purpose of this primer is to reach the anti-water, and seal the substrate completely and avoid air-bubbles in the body coating;
3) The reference consumption is 0.15kg/m2. Rolling, brush or spray the primer evenly (as the attached picture show) by 1 time;
4) Wait after 24 hours, the next application step to coat the enamel top coating;
5) After 24 hours, according to the site condition, polishing can be done, this is optionally;
6) Inspection: ensure the paint film is evenly with uniform color, without hollowing.
Enamel Top Coating:
1) Mix ( A ) enamel top coating, ( B ) curing agent and ( C ) thinner in a barrel according to ratio by weight;
2) Fully mix and stir in 4-5 min until without equal bubbles, ensure paint be fully stirred;
3) The reference consumption is 0.25kg/m2. Rolling, brush or spray the primer evenly (as the attached picture show) by 1 time;
4) Inspection: ensure the paint film is evenly with uniform color, without hollowing.
1) The mixing paint should be used within 20 minutes;
2) Maintain 1 week, can be used when paint is solid absolutely;
3) Film protection: keep away from stepping on, rain, exposing to sunlight and scratching until the film is fully dried and solidified.